Your current location : Home > Newsroom >Industry News
Newsroom
CEC News
Industry News
 
Industry News

Pressurizer at Tianwan Unit 6 installed

 

The pressurizer for Tianwan Unit 6 has been successfully installed, according to a statement by CNNC on May 17.

 

A pressurizer is a key component of a nuclear reactor's primary loop system. It helps maintain pressure when the nuclear reactor is operating.

 

The device was designed by the Nuclear Power Institute of China, a subsidiary of CNNC located in Sichuan province. The pressurizer was painted black and white to imitate the giant panda, for which Sichuan is famous.

 
Home About Us Newsroom Data & Publications Featured Events & Proprams Power Industry Basics Contact Us
 
CEC in Brief
President鈥檚
Message
Executives
Functions
Structure
Members
CEC News
Industry News
Reports and Publications
Data/Statistics
Standards
Reliability
Events
Programs
Multimedia
Generation
Distribution/Grids
Consumption
Sustainability
Regulator
 
Copyright CEC All Rights Reserved.         No.1 Lane 2, Baiguang Road, Xicheng District, Beijing, 100761 China         E-mail:cecintl@cec.org.cn